Roadmap (all entries are plans)

This page collects the plan: what the bench intends to deliver by which date, and the yardsticks success is measured against.

Plans are not results — the measured values live on the other pages and are joined in here only as a status column.

All dates and targets on this page are plans; measured values live on the other pages. Every entry below carries a PLAN badge.

Goals (G1–G6)

GoalTarget (plan)Measured today
G1 scalePLAN ≥ 100 high-quality surgical procedure/task envs, each past the env gate and citing proclib; ≥ 1,000 env variants (task × patient anatomy × arm count × port layout × difficulty).170 registered, 53 green, 0 counted — registry
G2 qualityPLAN An env counts only at realism ≥ 8/10 with real anatomy and cited/calibrated physics; below the bar it stays gated-not-counted with its gap list. Every env passes the env gate (next section).best judged realism 5/10; bar: green env AND realism receipt glm_score >= 8
G3 multi-robotPLAN ≥ 15 tasks that need 2–8 arms to cooperate.23 tasks for 2–8 arms (receipt R10); 0/23 counted toward G1 yet (receipt R10)
G4 agent-drivenPLAN (a) an agent env factory generates, gates and registers new envs with no human step; (b) agent baselines (LLM planner, VLA, ACT/scripted) evaluated on the whole bench with receipts.24 envs registered from the agent env factory source (factory-v1)
G5 paper packagePLAN Method, bench tables, figures, a real-output video and reproducible run commands by 12-04; submission and any public release is an owner gate.paper page; targets on this page are plan dates
G6 beyond humanPLAN Every task family carries a cited human-expert baseline; tables report the agent / human-expert ratio; "beyond human" only where measured.measured for 7 families (receipt R9)

Weekly plan to the RSS 2026-12-04 package

WeekDates (plan)Planned outputMeasured today
W111-06..11-12PLAN env registry + unified API on i4h/Arena; inventory and port every source; env gate script; ≥ 30 envs greenregistry live: 170 registered, 53 green, 44 red (see environments); receipt R12 records the W1 snapshot (63 registered / 10 green at write time) before the factory builds landed
W211-13..11-19PLAN multi-robot tasks (≥ 15); variant generator (patients, arms, ports); agent env factory v1 builds proclib to-build items; ≥ 60 envs, ≥ 500 variants24 envs registered from the factory source; multi-arm task set measured in R10
W311-20..11-26PLAN agent env factory at scale; best-backend realism upgrades (blood/fluid, tissue, render); baselines on NRP; ≥ 100 envs, ≥ 1,000 variants(not started - plan)
W411-27..12-04PLAN freeze 12-01; tables, figures, video, paper draft; reproducibility pass; owner gate for submission(not started - plan)

Hard target dates and yardsticks

IdTarget (plan)
G1-D-S30PLAN >= 1,000 COUNTED envs by 2026-11-30 (paper number freeze); >= 10,000 for the next version (RSS final 2027-04-16 / bench v2)
G2PLAN an env counts only at realism >= 8/10 with real anatomy and cited/calibrated physics
G3PLAN >= 15 tasks needing 2-8 cooperating arms
RSS-stage1PLAN RSS 2026-12-04 Stage 1 extended abstract due (6 pp = 5 + 1 refs, verified CFP)

Plan sources